Muzaffarabad: (Parliament Times) AJ&K Development Working Party (AJ&K DWP) on Tuesday brought under consideration 22 developmental projects worth Rs.3.77 billions under Health, Works, Information Technology, Tourism, Development Authorities, Social Welfare and Population Welfare sectors.
A meeting of AJK DWP held here with Syed Asif Shah Additional Chief Secretary (ACS) development in the chair. The projects came under consideration by the DWP were included Up-gradation of school of Nursing at State College of Nursing Mirpur,Population Welfare Program in AJK&K, Drug Addicts Rehabilitation Center Muzaffarabad Pilot Project (Revised) , Restoration of Flood Resilience Protection Structures Of 1.7 MW Dhanna HPP , District Kotli (Pakage 08), Paradigm Shift in Trainings and Assessment from Conventional to Internationally Accepted CBT&A, Capacity Building of AJK PDO (Revised PC-II), Proposal for extension in execution period of various schemes of PP&H & PDA, Rawalakot , Establishment of Computer Labs in Educational Institutions in Earthquake affected Districts of AJ&K (Excluded from preview of SERRA) (Phase –II), Establishment of Archeology Wing in AJK and survey and Feasibility study for archeological assets in AJK, Establishment of Publicity Network for Tourists in Azad Kashmir , Development of Tourism in Neelum District Through Public private partnership (Phase –I),Provision of Basic Tourism Amenities including Lake Development in AJ&K, Construction of Tourists Lodges in AJ&K,Improvement , Metalling and black Topping of Noseri –Authmuqam road (Damaged Portions), Length 37 KM, District Neelum, Imporvement & re- conditioning of Muzaffarabad to Shaheed Gali road Via Thanger (Remaining Portion),length 4.40 KM , District Muzaffarabad A.J.K, Improvement of Drainage and Protection Work Western Bank Naluchi By pass to Chellah Bandi Road Length 4.5 KM, District Muzaffarabad, Improvement and Reconditioning of Muzaffarabad Noseri Road Length 40 KM Distt . Muzaffarabad AJ&K, Improvement and Reconditioning of Chikar to Sudhan Galli road Length 17 KM, District Jehlum Valley, Improvement and Reconditioning of Neli to Lamnian road, length 16 km , District Jehlum Valley.
Addressing the meeting, ACS-D Syed Asif Shah directed the departments to make sure the best utilization of public funds by completing the projects in time without compromising on quality of work.